Effective Date | Description of Change | Download |
10/31/2022 | P-22-022869 - Process change: present we work 3 operators on 3 work station in one line: 1 automatic spring assembly, 2 gauge checking, 3 lubrication process. After improvement all 3 operations will be integrated in automatic process. In this way we give better quality, more efficiency process and we save 2 or 1 operator. | Download |
10/31/2022 | P-22-022938 - Process improvement. where an automation will be implemented to improve quality and efficiency of the process. More details can be found in attached presentation | Download |
06/13/2022 | P-22-022902 - Cancel PCN P-22-022869.
original pcn P-22-022869 - Process change: present we work 3 operators on 3 work station in one line: 1 automatic spring assembly, 2 gauge checking, 3 lubrication process. After improvement all 3 operations will be integrated in automatic process. In this way we give better quality, more efficiency process and we save 2 or 1 operator." | Download |
03/05/2021 | P-20-019397 - Tool Replacement/new tool. we hereby inform you about a replacement of a assembly tool for below listed TE products. Tool build and serial production at TE Esztergom. As a result of our continuous strive for quality improvements of our production, we hereby inform you upfront about a new tool 31-1952686, which is under construction In order to meet all specification requirements to replace the current one, which is worn out. | Download |
01/04/2021 | P-20-019234 - Manufacturing location change. Will be transferred from sender supplier Germany to TE-Connectivity-Plant W rt (Germany). transferred PN's 1-21412018-3 / 5-21412108-3 | Download |
01/04/2021 | P-20-019235 - Manufacturing Location Change.will be transferred from sender supplier Germany to TE-Connectivity-Plant Woert (Germany). Transferred PN 1-21411489-0 | Download |
02/29/2016 | E-15-002893 - Product Improvement. Lubrication change. | Download |