Effective Date |
Description of Change
| Download |
10/01/2020 |
P-20-018677 - Product Migration. migrating per June 1st 2020 a portion of the business from the Le Mans facility to the TE Connectivity location in Bydgoszcz, Poland. As a result the part numbers below will be transferred with new production estimated to start beginning from October 2020. |
Download |
10/01/2020 |
P-20-018688 - Product Migration. migrating per June 1st 2020 a portion of the business from the Le Mans facility to the TE Connectivity location in Bydgoszcz, Poland. As a result the part numbers below will be transferred with new production estimated to start beginning from October 2020 |
Download |