Effective Date | Description of Change | Download |
02/26/2025 | 515592 - Equipment Transfer, Production Transfer or Rearrangement. This notification is to inform you that the listed PNs will add DG2/DG3 as alternative production site. No changes will be made to product as part of this change. Details can refer to below contents.
| Download |
11/15/2022 | 512991 - Retraction of PCN 511316. cancelled post customer communication on PCN 511316 about expanding & moving to different location of supplier of molex, heng feng operation | Download |
05/31/2022 | 511316 - Equipment transfer, Production transfer or Rearrangement. The component supplier of molex HengFeng is expanding their operation and moving to a different location within the same city to improve the factory environment, expand the area, increase equipment and production capacity. the new plant area is larger, with more equipment and greater production capacity.
| Download |
03/15/2022 | 510530 - Change Supplier. Molex QSP Latch vendor is changing its raw material supplier. the material will remain Stainless Steel (full hard), however the location of the supplier will be different.
| Download |
07/31/2020 | 508887 - Change to Product. New labels which is implemented will have additional details of S/N as per SMC schema, S/N bar code, UPC number and barcode. | Download |