Effective Date | Description of Change | Download |
05/15/2023 | PCN-23-169342 - Manufacturing location change. Following Part Numbers will be transferred from TE's subcon to TE Suzhou Plant. Mass Production will be started from May 2023. | Download |
04/18/2022 | P-22-022507 - Second Manufacturing location. According to operational strategy, TE decided to produce these P/Ns at both locations China(TECC) and Japan. | Download |
10/12/2021 | P-21-021314 - Capacity Expansion. Build a New Die For Dynamic D5000 Receptacle Contact
| Download |
03/30/2020 | P-20-018577 - Manufacturing location change. From Japan to China. Last order date:2020/03/29 | Download |
12/01/2016 | E-16-012645 - Product Improvement. Changed the dimension on Production drawings.No changes of form, fit, or function for the customer. And the Customer drawing and the Product Specification are not changed. Therefore, No need to get the approval from the customer for this notice. | Download |
04/11/2016 | P-16-012580 - UPDATE TO PCN P-16-012528. To ensure a smooth and stable transition from SWDC to EPDC, TE will be delaying the transition from the current Santa Teresa, NM DC (SWDC) to the new El Paso, TX DC (EPDC), originally scheduled to implement February 8th - 15th, is now scheduled to implement April 11th - 15th. This delay will allow extended testing on all SAP systems and procedures to ensure a seamless transition into the new warehouse. As we migrate the product and go-live on the new SAP WM software, it is critical to ensure this testing and training is fully incorporated into the systems and operational processes in the new El Paso warehouse. Based on the revised timing of transition, both Customer Shipments and Supplier Deliveries will continue to process from the Santa Teresa, NM location: Address: 101 Lindbergh, Santa Teresa, NM 88008, DUNS Code: 036967748. See attached Customer Letter. | Download |
02/15/2016 | P-16-012528 - Location Change. TE has established a new Distribution Center in El Paso, TX to support our South-West Customers. The transition to El Paso will take place during the weekend of February 13th - 14th. | Download |
01/29/2016 | E-15-012878 - Product Improvement. Add tooling for improving capacity. Add ID mark to contact for new tooling. The drawings for the listed part numbers have been modified for clarification. Issued this PCN in P-15-011652. | Download |
08/19/2015 | P-15-011652 - Product Improvement. Add new tooling for improving capacity. Logo mark of new and existing tooling will be changed to TE logo mark in order to unify logo mark. Add stmping ID to new and existing tooling in order to distinguish. | Download |
05/29/2015 | P-15-011347 - Product Improvement. Additional tooling at Japanese vendor. | Download |