Effective Date | Description of Change | Download |
06/10/2024 | P-24-025866 -Packaging Change. Following terminal part numbers produced in TE Thailand Manufacturing Plant will change packaging box design to align same as TE Japan. There are no other changes. Reference to P-21-020557, P-21-020936 and P-21-021196 for same parts produced in TE Japan.
| Download |
03/15/2024 | P-23-025258 - Tool Transfer. transfer of stamping tool 11-0254971 from TE Thailand to TE Wagholi, India. The transfer follows a strict procedure, which fully maintains quality, ability to supply and form-fit-function of the concerned products, including internal release and product validation as per OEM/CAM requirements, where applicable. The new manufacturing location operates under a certified quality management system in accordance with defined requirements. PPAP/PSW will be prepared, a request via ePPAP needs to be initiated by Customer within 2 weeks after receiving of this PCN. In case no request is obtained till above mentioned date, PPAP/PSW will be considered as approved and the change is considered as fully released
| Download |
02/20/2024 | P-23-025380 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. Change was already communicated via P-23-024531 but new PCN informs about postponed activation date: As of February 20, 2024 we will increase the delivery unit & the min. order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders.
| Download |
02/20/2024 | P-23-025381 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. Change was already communicated via P-23-024531 but new PCN informs about postponed activation date: As of February 20, 2024 we will increase the delivery unit & the min. order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders.
| Download |
01/22/2024 | P-24-025625 - Alternate Manufacturing source for Japan Customers only. This PCN Affects customers purchasing from TE Japan only. Adding TE China for alternate manufacturing source. PN is currently in mass production at that location.
| Download |
12/20/2023 | P-23-025200 - Reel Qty Change. Terminal reeling quantity will be increased. No any changes on the products. Running change.
| Download |
11/06/2023 | P-23-025194 - Change Shipping Point. Change the shipping point from EP20 and WCDC to HL20 or HL30 Optimize the shipping routes, using national shipping points for local customers
| Download |
10/04/2023 | P-23-025196 - PCN-23-023681 is cancelled. Target products and number of terminal reeling quantity will be changed. | Download |
07/20/2023 | P-23-024531 - Change to DU & MOQ. change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of July 20, 2023 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. No PPAP will be submitted for this PCN.
| Download |
07/07/2023 | P-23-024747 - Shipping Point Change. Change the shipping point from EP20 and WCDC to HL20, HL30 or HL40 | Download |
04/20/2023 | P-23-023861 - Reeling Qty increased. Terminal reeling quantity will be increased. No any changes on the products. Running change. New quantity will be different by PN | Download |
12/15/2022 | P-22-023665 - Change Shipping Point. Change the shipping point from EP20 and WCDC to HL20 or HL30. Optimize the shipping routes, using national shipping points for local customers | Download |
10/24/2022 | P-22-023403 - Change Shipping Point. Change the shipping point from EP20 nad WCDC to HL20. Optimize the shipping routes, using national shipping points for local customers
| Download |
09/01/2022 | P-22-023264 - Dual Source of materials. Affects customers purchasing from TE Thailand only. Adding TE Japan for alternate manufacturing source. PN is currently in series production at that location. Material Name (same Dual source): 025 REC CONTACT 025 ECU PLUG HSG ASSY 32P 025 ECU PLUG HSG ASSY 16P | Download |
09/20/2021 | P-21-021196 - Product improvement. Packing spec changes. Start the shipment from Sep-'21, Running change. Detail refer to below link. No mixed shipment existing packing style and new packing style. See attachment file. The changes will apply for Japan manufacturing part only. | Download |
03/25/2021 | P-21-020510-2 - New Specification. TE Suzhou Process Label scan system update. TE Suzhou label Layout optimize and QR Code & Barcode optimize Barcode change to LT(3S) CODE QR code change to Part Number+ Package QTY+ PO Number+ Ver +date code+ Serial Number(0001~9999) This label change Not accept re-submit PPAP/PSW request | Download |
01/30/2015 | E-14-015479 - "Change of Make From." | Download |
01/15/2015 | P-14-010712 (xml) - Manufacturing location change. Following Part Numbers will be transferred from TE-Japan to TE-Thailand. : (Except Japan local customer). | Download |
02/28/2014 | P-14-009871 - Document clarification. | Download |
12/04/2013 | D-13-022181 - Document clarification. | Download |