Enhance your automotive connectivity with this MCP2,8BU-GEH ASSY2P, part of the AMP MCP 2.8 Connector System. Designed for female terminals, this housing features a single row with a 6mm pitch, ensuring secure and efficient wire-to-wire connections. With an IP67 rating, it offers protection against dust and water ingress, while its PA GF body material meets UL 94-HB flammability standards for safety. With two positions and a sealable design, it's ideal for automotive applications, guaranteeing reliable performance in temperatures ranging from -30 to 100°C. The black housing, measuring .984" in length, .894" in height, and 1.299" in width, boasts a 180° cable exit angle for versatile installation. Its terminal position assurance and primary locking feature on the terminal ensure a stable connection, while RoHS compliance reflects our commitment to environmental responsibility. Elevate your automotive connector setup with this essential accessory.
Availability
Immediate Shipment: NA
Stock Location: In Stock
Factory Stock: Call for Stock
Factory Lead:
Unit Of Measure:
Minimum/Multiple: 1/1
Pricing
CALL: 800.400.7041
Product Category:
Manufacturer: TE Connectivity
Manufacturer Part Number: TE Connectivity 1-1355200-1
Series: AMP MCP 2.8,AMP MCP Connector System
Gender: Housing for female terminals
Number of Rows: 1
Pitch: .236 in, 6 mm
IP Rating: IP67
Polarization: No
Body Material: PA GF
Number of Positions: 2
GPL: N10
Packaging: Container
Operating Temperature Range: -22 - 212 °F, -30 - 100 °C
Sealable: Yes
GPL Description: Automotive
Product Code: M105
Connector System: Wire to Wire
Length: .984 in
Cable Exit Angle: 180°
Height: 22.7 mm, .894 in
Width: 1.299 in, 33 mm
Mating Tab Width: .11 in, 2.8 mm
Body Color: Black
Serviceable: Yes
Mounting Feature: Without
Terminal Position Assurance: Yes
Connector Position Assurance Capable: No
Hybrid Connector : No
Primary Locking Feature: On the Terminal
Material Flammability Standard: UL 94-HB
Part Aliases: 1-1355200-1
SKU: AMP1-1355200-1

Environmental Initiative Details

Environmental Initiative: RoHS
Compliant: Unknown
Date of this Information: Unknown
Notes:

Product Change Notice

Effective Date Description of Change Download
07/18/2024 P-24-026572 - PCN Cancellation of P-23-024993 and P-24-026007. Transfer from TE Kurim (CZE) to TE Esztergom (HUN) included in PCN P-23-024993 and P-24-026007 is cancelled.
Download
04/30/2024 P-24-025681 - Capacity Improvement. Change only the seal assembly to automatic process (current manually assembly) - No changes in controls applied to check the presence and seal position.
Download
02/20/2024 P-23-025379 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of February 20, 2024 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders in case adjustments have not taken place in time.
Download
12/06/2023 P-23-024986 - Tool/Process Transfer. transfer of tools and/or processes . The transfer follows a strict procedure, which fully maintains quality, ability to supply and form-fit-function of the concerned products, including internal release and product validation as per OEM/CAM requirements, where applicable. The new manufacturing location operates under a certified quality management system in accordance with defined requirements. PPAP/PSW will be prepared (as per agreements between the two parties, including the negotiated TE trigger matrix), a request via ePPAP (via www.te.com or request to TE Sales representative) needs to be initiated by Customer within 2 weeks after receiving of this PCN. In case no request is obtained till above mentioned date, PPAP/PSW will be considered as approved and the change is considered as fully released.The transfer includes the assembly machine and also the related molding tools. Download
12/06/2023 P-23-024993 - Tool/Process Transfer. transfer of tools and/or processes from TE CZ Kurim to TE HUN Esztergom. The transfer follows a strict procedure, which fully maintains quality, ability to supply and form-fit-function of the concerned products, including internal release and product validation as per OEM/CAM requirements, where applicable. The new manufacturing location operates under a certified quality management system in accordance with defined requirements. PPAP/PSW will be prepared (as per agreements between the two parties, including the negotiated TE trigger matrix), a request via ePPAP (via www.te.com or request to TE Sales representative) needs to be initiated by Customer within 2 weeks after receiving of this PCN. In case no request is obtained till above mentioned date, PPAP/PSW will be considered as approved and the change is considered as fully released. The transfer includes the assembly machine and also the related molding tools.
Download
11/15/2023 P-23-025148 - Product Improvement. transfer of part number 1355341-1 from TE Connectivity San Salvo, Italy, to TE Connectivity Esztergom, Hungary. The transfer follows a strict procedure, which fully maintains quality, ability to supply and form-fit-function of the concerned products, including internal release and product validation as per OEM/CAM requirements, where applicable. The new manufacturing location operates under a certified quality management system in accordance with defined requirements.
Download
04/18/2023 P-23-024364 - Adding alternate manufacturing source. Adding TE Suzhou for alternate manufacturing source. PN is currently in series production at that location.
Download
03/31/2023 P-22-023372 - Product improvement. Brazilian production is to better meet customer demands and improve our delivery. The Brazil manufacturing location operates under certified quality management system in accordance with standard concerned automotive requirements. A TE internal release test based on relevant part specifications will be executed before delivery. PPAP will be submitted before SOP for all customers which had required. Download
10/24/2022 P-22-023403 - Change Shipping Point. Change the shipping point from EP20 nad WCDC to HL20. Optimize the shipping routes, using national shipping points for local customers
Download
08/27/2021 P-21-020977 - Manufacturing Location Change . We hereby inform you that TE is performing a change in the production place to third-party supplier . This movement will not impact manufacturing technology nor current production process. The related part/process approvals will be done in accordance with internal TE standards and upon request, customer requirements. Download
12/06/2019 P-19-017322 - Capacity change or tool replacement. TE hereby informs you upfront about a new tool 21-1780974, which is under construction In order to meet all specification requirements to replace the current one, which is worn out.

Download
10/28/2019 E-19-006636 - Product Improvement. Unlocking of contacts improved by changing an internal feature of the secondary locking PN 1355340-1.

Download
07/01/2019 P-19-017103 - Manufacturing Location Change. Location change to Brazil Production is to better meet customer demands and improve TE's delivery due to a capacity constrains.
Download
05/31/2019 P-18-016205 - Tool Duplication. As a result of our continuous strive for capacity increase of our production, we hereby inform you upfront about a new tool 21-1780245 for PN 1355340-1 and 20-1780787 for PN 1355341-1, which is under construction In order to meet all specification requirements to cover increasing market demand and which will run in addition to the current one. Download