Effective Date | Description of Change | Download |
11/08/2024 | P-24-027141 - Layout line update. we hereby inform you about the layout line update without impacting the process flow, just moving the equipment. The new method is executed by following a strict procedure which garantees, no negative influence on quality, ability to supply and for-fit-function of the concerned products. Please after receiving this notification, PPAP and samples must be requested by ePPAP System in 10 days. In case of you do not request in ePPAP, TE will understand and consider that this change was accepted.
| Product Change Notice Download |
07/18/2024 | P-24-026572 - PCN Cancellation of P-23-024993 and P-24-026007. Transfer from TE Kurim (CZE) to TE Esztergom (HUN) included in PCN P-23-024993 and P-24-026007 is cancelled.
| Product Change Notice Download |
04/30/2024 | P-24-025681 - Capacity Improvement. Change only the seal assembly to automatic process (current manually assembly) - No changes in controls applied to check the presence and seal position.
| Product Change Notice Download |
02/20/2024 | P-23-025379 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of February 20, 2024 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders in case adjustments have not taken place in time.
| Product Change Notice Download |
12/06/2023 | P-23-024986 - Tool/Process Transfer. transfer of tools and/or processes . The transfer follows a strict procedure, which fully maintains quality, ability to supply and form-fit-function of the concerned products, including internal release and product validation as per OEM/CAM requirements, where applicable. The new manufacturing location operates under a certified quality management system in accordance with defined requirements. PPAP/PSW will be prepared (as per agreements between the two parties, including the negotiated TE trigger matrix), a request via ePPAP (via www.te.com or request to TE Sales representative) needs to be initiated by Customer within 2 weeks after receiving of this PCN. In case no request is obtained till above mentioned date, PPAP/PSW will be considered as approved and the change is considered as fully released.The transfer includes the assembly machine and also the related molding tools.Product Change Notice Download | |
12/06/2023 | P-23-024993 - Tool/Process Transfer. transfer of tools and/or processes from TE CZ Kurim to TE HUN Esztergom. The transfer follows a strict procedure, which fully maintains quality, ability to supply and form-fit-function of the concerned products, including internal release and product validation as per OEM/CAM requirements, where applicable. The new manufacturing location operates under a certified quality management system in accordance with defined requirements. PPAP/PSW will be prepared (as per agreements between the two parties, including the negotiated TE trigger matrix), a request via ePPAP (via www.te.com or request to TE Sales representative) needs to be initiated by Customer within 2 weeks after receiving of this PCN. In case no request is obtained till above mentioned date, PPAP/PSW will be considered as approved and the change is considered as fully released. The transfer includes the assembly machine and also the related molding tools.
| Product Change Notice Download |
11/15/2023 | P-23-025148 - Product Improvement. transfer of part number 1355341-1 from TE Connectivity San Salvo, Italy, to TE Connectivity Esztergom, Hungary. The transfer follows a strict procedure, which fully maintains quality, ability to supply and form-fit-function of the concerned products, including internal release and product validation as per OEM/CAM requirements, where applicable. The new manufacturing location operates under a certified quality management system in accordance with defined requirements.
| Product Change Notice Download |
04/18/2023 | P-23-024364 - Adding alternate manufacturing source. Adding TE Suzhou for alternate manufacturing source. PN is currently in series production at that location.
| Product Change Notice Download |
03/31/2023 | P-22-023372 - Product improvement. Brazilian production is to better meet customer demands and improve our delivery. The Brazil manufacturing location operates under certified quality management system in accordance with standard concerned automotive requirements. A TE internal release test based on relevant part specifications will be executed before delivery. PPAP will be submitted before SOP for all customers which had required. | Product Change Notice Download |
10/24/2022 | P-22-023403 - Change Shipping Point. Change the shipping point from EP20 nad WCDC to HL20. Optimize the shipping routes, using national shipping points for local customers
| Product Change Notice Download |
08/27/2021 | P-21-020977 - Manufacturing Location Change . We hereby inform you that TE is performing a change in the production place to third-party supplier . This movement will not impact manufacturing technology nor current production process. The related part/process approvals will be done in accordance with internal TE standards and upon request, customer requirements. | Product Change Notice Download |
12/06/2019 | P-19-017322 - Capacity change or tool replacement. TE hereby informs you upfront about a new tool 21-1780974, which is under construction In order to meet all specification requirements to replace the current one, which is worn out.
| Product Change Notice Download |
10/28/2019 | E-19-006636 - Product Improvement. Unlocking of contacts improved by changing an internal feature of the secondary locking PN 1355340-1.
| Product Change Notice Download |
07/01/2019 | P-19-017103 - Manufacturing Location Change. Location change to Brazil Production is to better meet customer demands and improve TE's delivery due to a capacity constrains.
| Product Change Notice Download |
05/31/2019 | P-18-016205 - Tool Duplication. As a result of our continuous strive for capacity increase of our production, we hereby inform you upfront about a new tool 21-1780245 for PN 1355340-1 and 20-1780787 for PN 1355341-1, which is under construction In order to meet all specification requirements to cover increasing market demand and which will run in addition to the current one. | Product Change Notice Download |