Effective Date | Description of Change | Download |
02/20/2024 | P-23-025379 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of February 20, 2024 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders in case adjustments have not taken place in time.
| Download |
01/13/2023 | P-22-023726 - MOQ Change Alignment.TE is changing its system as it relates to minimum order quantities for the part numbers listed to address trends that have been recently observed. We have identified situations where quantities can be ordered at quantities below what our standard packaging requirements allow. The situation also results in non-standard handling (break-pack) and creates risks for damage during transit to our customers. Therefore, we are making changes to align minimum order quantities with appropriate standard packaging requirements for these part numbers. | Download |
11/10/2022 | P-22-023614 - Manufacturing location change. will be transferred from TE Connectivity Technology (SIP) Ltd No.128 tinglan Lane Suzhou park China to K2 kunshan Plant
| Download |
03/31/2020 | P-20-018797 - Product Improvement: Packaging method
| Download |
01/02/2017 | P-16-013956 - Product improvement. To ensure the quality level as well as the supply also in future we would like to inform you with this PCN about a production area extension with layout optimization at our TE Molding Supplier Alhorn. This change will have based on an internal risk-analysis no significant impact on the processes for parts on component level as well as for finished goods. As the extended area will be equivalent to the existing production area at the same manufacturing location as of today, the process validation- , capability analysis and release will be done TE internal. Therefore this PCN is for your notification only. If you would like to review the planned scenario please contact your Sales/Marketing representative. | Download |
08/30/2016 | P-16-013179 - Product Improvement. For following part we have built a new tool:1394871-1. | Download |
04/25/2016 | P-16-012867 - Packaging Change Before Packaging situation : 10.000 pcs/bag (PPQ), 8 bags/box, 80.000 pcs/box (APQ) After Packaging situation: 10.048 pcs/bag (PPQ), 8 bags/box, 80.384 pcs/box (APQ) Carton box dimension will stay the same. | Download |
04/11/2016 | P-16-012574 - UPDATE TO PCN P-16-012519. To ensure a smooth and stable transition from SWDC to EPDC, TE will be delaying the transition from the current Santa Teresa, NM DC (SWDC) to the new El Paso, TX DC (EPDC), originally scheduled to implement February 8th - 15th, is now scheduled to implement April 11th - 15th. This delay will allow extended testing on all SAP systems and procedures to ensure a seamless transition into the new warehouse. As we migrate the product and go-live on the new SAP WM software, it is critical to ensure this testing and training is fully incorporated into the systems and operational processes in the new El Paso warehouse. Based on the revised timing of transition, both Customer Shipments and Supplier Deliveries will continue to process from the Santa Teresa, NM location: Address: 101 Lindbergh, Santa Teresa, NM 88008, DUNS Code: 036967748. See attached Customer Letter. | Download |
02/15/2016 | P-16-012519 - Location Change. As of the end of August 2015, our current distribution center located in Santa Teresa, New Mexico was divested to Commscope. As a result, TE has established a new Distribution Center in El Paso, TX to support our South-West Customers. | Download |