Effective Date | Description of Change | Download |
01/29/2021 | E-21-000065 - Drawing Clarification. The drawings for the listed part numbers have been modified for clarification. Before: Marking drawing in BOM. After: Marking drawing in Engineering specification. Required to comply with internal documentation requirements. No change to product.
| Download |
09/14/2012 | P-12-008326 - PCN (P-12-008206) was distributed on 7/30/12 advising the CCC marking was temporarily being removed from the following circuit breaker families W28, W51, W54 and W57. That suspension has been resolved with the China CQC approval agency with no impact to product built before or during this suspension. Please note any of your products utilizing these TE circuit breakers shipped into China will require CCC mark to clear China customs. So as to keep our customers in production, you may see a mix of CCC marked and unmarked product for a period of time. | Download |
08/01/2012 | The CCC approval mark granted from the China Quality Certification Center (CQC) is temporarily being removed from the W28, W51 and W57 circuit breaker families. Production of product without the mark will continue in order to have product available for those customer that do not require the CCC mark. Please note that this temporary situation does not impact any of our other global agency marking on the subject parts. Be assured that we are taking necessary actions to resolve this matter as quickly as possible and expect resolution in September. | Download |