Effective Date | Description of Change | Download |
06/19/2023 | MB-433 - Manufacturing Location Change. JAE will be moving its molding and assembly processes from the US to Mexico. Raw materials will remain the same and the connectors will meet all of the same dimensions and specifications as before. | Product Change Notice Download |
03/24/2023 | MB-431 - Molding tool Replacement. JAE’s supplier for the molding production of MX19 seal rings and grommets will replace the molding tooling as the existing mold tooling has reached the end of its lifecycle. The connector will meet all of the same dimensions and specifications as before. There will be no changes to the connector handling, form, fit, or function.
| Product Change Notice Download |
03/11/2019 | MB-307 - Manufacturing Location Change. The manufacturing location of two rubber components in the JAE MX19 part numbers below will be changing from Japan to the Philippines. The manufacturing location for other components and final assembly location will not change. There will be no changes to design, form, fit or function.
| Product Change Notice Download |
09/01/2017 | MB-235 - JAE Oregon will begin qualifying an additional 2nd supplier for the rubber seal ring and grommet components of MX19002S51. The materials and specifications will remain the same as those supplied by our current supplier. There will be no change to design, form, fit or function of this product. | Product Change Notice Download |
04/06/2017 | MB-236 - JAE Oregon will be receiving an additional plastic injection mold (B) for MX19002S51. There is no change to the product; Design, form, fit and function remain the same. | Product Change Notice Download |
10/17/2016 | MB-213 - Production Process Change. MX19 (2 positions) New Auto Assembly Machine To replace the old one. | Product Change Notice Download |