Effective Date | Description of Change | Download |
09/29/2024 | PCN-24-204878 - Material Change. TE Connectivity is making a material change to for the part number(s) listed below. These PNs are TE proprietary designs, therefore considered catalog/general market product. PPAP and/or sample requests must be submitted within 14 days of PCN submission via ict-ppap-request@te.com or ePPAP system. Submission will not occur without request. If PPAP requested, disposition response is required within 14 days of submit date or it will be considered approved. Product drawing(s) < are > affecte
Download | |
08/11/2024 | PCN-23-192354 - Adding New Capacity Tooling. TE Connectivity is adding new capacity tooling for the secondary locking device for the part number(s) listed below. These PNs are customer restricted designs and require customer approval before shipment. Please provide us with your immediate approval to prevent shipment delays. PPAP and/or sample requests must be submitted within 14 days of PCN submission via ict-ppap-request@te.com or ePPAP system. Submission will not occur without request. If PPAP requested, disposition response is required within 14 days of submit date or it will be considered approved. Product drawing(s) are not affected.
| Download |
10/30/2022 | PCN-22-146685 - Adding New Capacity Tooling. TE Connectivity is adding new capacity tooling for 21POS,AMP MCP2.8,REC HSG,ASSY for the part number(s) listed below. These PNs are customer restricted designs and require customer approval before shipment. Please provide us with your immediate approval to prevent shipment delays. PPAP and/or sample requests must be submitted within 14 days of PCN submission via ict-ppap-request@te.com or ePPAP system. Submission will not occur without request. If PPAP requested, disposition response is required within 14 days of submit date or it will be considered approved. Product drawing is not affected. | Download |
10/14/2022 | P-22-023324 - tool and/or processes from TE Connectivity Kurim (CZ) to TE Connectivity Morocco ICT. The transfer follows a strict procedure, which fully maintains quality, ability to supply and form-fit-function of the concerned products, including internal release and product validation as per OEM/CAM requirements, where applicable. The new manufacturing location operates under a certified quality management system in accordance with defined requirements. PPAP/PSW will be prepared (as per agreements between the two parties, including the negotiated TE trigger matrix), a request via ePPAP (via www.te.com or request to TE Sales representative) needs to be initiated by Customer within 2 weeks after receiving of this PCN. | Download |
11/22/2021 | P-21-021511 - Manufacturing location change. We hereby inform you that TE is performing a change in the production location place. This movement will not impact manufacturing technology nor staff. The related part/process approvals will be done in accordance with TE internal standards and upon request, customer requirements. | Download |
04/15/2021 | P-21-020595 - Manufacturing location change. Transfer of duplicity tool for Following already transferred Part Numbers from TE Kurim Czech Republic to TE Tangier ICT Morocco.
| Download |
03/30/2021 | P-20-019183 - Manufacturing Location Change. Brazil Production is to better meet customer demands and improve our delivery. The Brazil Manufacturing location operates under certificated quality management system in accordance with standard concerned automotive requirements.
| Download |
03/12/2021 | E-20-010814 - Lever and slide correction. Lever and Slide correction to improve handling in field. No further impact by customer. no visual change to product.
| Download |
06/01/2020 | P-19-018370- Following molding Part Numbers will be transferred from TE Kurim Czech Republic to TE Morocco ICT: PN 1355228-1 PN 1355228-2 | Download |
05/01/2020 | P-20-018614 - Manufacturing Location Change. Molding moving from TE Kurim Czech Republic to TE Morocco. | Download |
03/27/2020 | P-20-018640 - Manufacturing Location Change. As a result of our continuous strive for quality improvements of our production, we hereby inform you upfront about a new tool 21-1949076, which is under construction In order to meet all specification requirements to replace the current one, which is worn out and also production location changing from Supplier Formplast / CZ to TE plant ICT / Morocco. | Download |
01/15/2020 | E-19-007638 - Product Improvement. Reducing the height of the hook in one of the two mold to have equal operation forces with slides of both molds. | Download |
07/12/2019 | P-19-017214 - Capacity change or tool replacement. Tool 31-1829917, which is under construction In order to meet all specification requirements to cover increasing market demand and which will run in addition to the current one.
| Download |
03/15/2019 | P-19-016972 - Tool Duplication. As result of our continuous strive for capacity increase of our production, we hereby inform you upfront about a new tool, which is constructed meeting all specification requirements to cover increasing market demand and which will run in the TE ICT Plant Tangier. | Download |
05/31/2016 | E-16-002055 - Product Improvement. Minor change on Receptacle Housing. Adding to pockets in Rec. Housing, cavity block area to create more space for the counter part (cavity block) to avoid appearance of plastic chips in production. | Download |
01/20/2014 | P-13-009750 - Manufacturing location change. | Download |