Effective Date | Description of Change | Download |
05/25/2023 | PCN-23-175414 - Part and drawing revision alignment. Corrections to drawing notes (including removing preliminary note for part number 2-480416-4, and showing that part number 1-480435-3 is superseded).
| Product Change Notice Download |
07/22/2021 | E-19-017394-C - Cancellation of PCN E-19-017394.After further consideration, the V2 resin will remain active to continue giving customers an option especially as we navigate through global resin shortages | Product Change Notice Download |
01/31/2020 | E-19-017394 - Discontinuance. Due to the global market shift from UL-V2 resins to UL-V0 resins, TE will be consolidating resins globally eliminating UL-V2 housings and offering UL-V0 alternatives in response to this shift.
| Product Change Notice Download |
03/12/2019 | E-18-016452-C - Cancellation of PCN E-18-016452.
| Product Change Notice Download |
02/19/2019 | E-18-016452 - Discontinuance. Due to the global market shift from UL-V2 resins to UL-V0 resins, TE will be consolidating resins globally eliminating UL-V2 housings and offering UL-V0 alternatives in response to this shift. All new UL-V0 alternatives will meet or exceed the performance levels of the UL-V2 housings being replaced.
| Product Change Notice Download |
04/11/2016 | P-16-012579 - UPDATE TO PCN P-16-012527. To ensure a smooth and stable transition from SWDC to EPDC, TE will be delaying the transition from the current Santa Teresa, NM DC (SWDC) to the new El Paso, TX DC (EPDC), originally scheduled to implement February 8th - 15th, is now scheduled to implement April 11th - 15th. This delay will allow extended testing on all SAP systems and procedures to ensure a seamless transition into the new warehouse. As we migrate the product and go-live on the new SAP WM software, it is critical to ensure this testing and training is fully incorporated into the systems and operational processes in the new El Paso warehouse. Based on the revised timing of transition, both Customer Shipments and Supplier Deliveries will continue to process from the Santa Teresa, NM location: Address: 101 Lindbergh, Santa Teresa, NM 88008, DUNS Code: 036967748. See attached Customer Letter. | Product Change Notice Download |
02/15/2016 | P-16-012527 - Location Change. TE has established a new Distribution Center in El Paso, TX to support our South-West Customers. The transition to El Paso will take place during the weekend of February 13th - 14th. | Product Change Notice Download |
08/15/2012 | E-12-014529 - New product. | Product Change Notice Download |