Enhance your automotive connectivity with the MQS REC 40P ASSY, a versatile housing designed for female terminals. Featuring four rows and three pitches, including 2.54mm and 5.8mm, this component offers flexibility in signal circuit applications. With a 12V DC voltage rating and UL 94-HB flammability standard compliance, it ensures reliable performance in demanding environments. The sealable design and operating temperature range of -40 to 120°C (-40 to 248°F) make it suitable for various applications. This black connector, with a height of 31mm and width of 37.4mm, is not only serviceable but also incorporates terminal position assurance for added security. Whether for wire-to-board or wire-to-device connections, this automotive connector accessory is essential for streamlined operations in hybrid connector setups. Rest assured, it is RoHS compliant, aligning with environmental standards. Upgrade your connectivity with this essential component.
Availability
Immediate Shipment: NA
Stock Location: In Stock
Factory Stock: Call for Stock
Factory Lead:
Unit Of Measure:
Minimum/Multiple: NA/NA
Pricing
CALL: 800.400.7041
Product Category:
Manufacturer: TE Connectivity
Manufacturer Part Number: 1473252-1
Series: MQS
Gender: Housing for female terminals
Number of Rows: 3, 4
Pitch: .114 in, .1 in, .228 in, 2.54 mm, 2.9 mm, .311 in, 5.8 mm, 7.9 mm
Voltage: 12 V DC
Row Spacing: .173 in, 4.4 mm
Polarization: Yes
Number of Positions: 40
GPL: N02
Operating Temperature Range: -40 - 120 °C, -40 - 248 °F
Circuit Application: Signal
Sealable: Yes
GPL Description: Automotive
Product Code: M107
Connector System: Wire to Board, Wire-to-Device
Length: 2.138 in
Cable Exit Angle: 90°
Height: 1.22 in, 31 mm
Width: 1.472 in, 37.4 mm
Mating Tab Width: .025 in, .11 in, 2.8 mm, .63 mm
Nominal Voltage Architecture: 12 V
Body Color: Black
Serviceable: Yes
Mounting Feature: Without
Terminal Position Assurance: Yes
Connector Position Assurance Capable: No
Hybrid Connector : Yes
Material Flammability Standard: UL 94-HB
Part Aliases: 1473252-1
SKU: AMP1473252-1

Environmental Initiative Details

Environmental Initiative: RoHS
Compliant: Unknown
Date of this Information: Unknown
Notes:

Product Change Notice

Effective Date Description of Change Download
02/20/2024 P-23-025380 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. Change was already communicated via P-23-024531 but new PCN informs about postponed activation date: As of February 20, 2024 we will increase the delivery unit & the min. order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders.
Download
02/20/2024 P-23-025381 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. Change was already communicated via P-23-024531 but new PCN informs about postponed activation date: As of February 20, 2024 we will increase the delivery unit & the min. order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders.
Download
07/20/2023 P-23-024531 - Change to DU & MOQ. change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of July 20, 2023 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. No PPAP will be submitted for this PCN.
Download
07/07/2023 P-23-024747 - Shipping Point Change. Change the shipping point from EP20 and WCDC to HL20, HL30 or HL40 Download
05/01/2023 P-23-024232 - Raw material change. Change the raw material supplier. The raw material grade is the same and there is no impact production function and performance.
Download