Effective Date | Description of Change | Download |
02/20/2024 | P-23-025379 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of February 20, 2024 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders in case adjustments have not taken place in time.
| Download |
12/29/2023 | P-23-024744 - Tooling Replacement. we hereby inform you about a tool replacement of a mold tool for the TE product "JUNIOR POWER TIMER HOUSING". Tool build and serial production at TE Oostkamp.
| Download |
08/01/2023 | PCN-23-182936 - Draft error. Removed the extra material of counter product at the chamber location | Download |
01/01/2022 | P-21-021939 - Process Optimization. For process optimization we will decrease the PPQ from 1000 pcs to 800 pcs in the same corrugated box. As a result of our continuous strive for improving the quality of our processes, we hereby inform you about the change of the packaging. The change will have no negative influence on quality, ability to supply and form-fit- of the concerned products. | Download |
11/15/2019 | P-19-017982 - Manufacturing location change. Following Part Numbers will be transferred from TE Steinach to TE Oostkamp. | Download |
01/23/2018 | P-17-015058 - Consolidation of distribution centers. | Download |