Effective Date | Description of Change | Download |
04/12/2024 | P-23-025363 - Mold Tool Transfer. transfer of mold tool(21-0067042) from Supplier Italy to TE Wagholi India. The transfer follows a strict procedure, which fully maintains quality, ability to supply and form-fit-function of the concerned products, including internal release and product validation as per OEM/CAM requirements, where applicable. The new manufacturing location operates under a certified quality management system in accordance with defined requirements. Level 2 PPAP /PSW will be prepared and submit for approval, a request via ePPAP (via www.te.com or request to TE Sales representative) needs to be initiated by Customer within 2 weeks after receiving of this PCN
| Product Change Notice Download |
12/01/2023 | P-23-025260 - Alternate manufacturing source. FOR CUSTOMERS IN NA REGION ONLY! Adding TE Kunshan for alternate manufacturing source. PN is currently in series production at that location.
| Product Change Notice Download |
09/25/2023 | P-23-024812 - Resin Supplier Extension. he supplier base extension is needed to protect our customers and TE Connectivity from material shortages risks and ensure deliveries. Alternative resin/material introduced is a recompound resin (PA66-GF), whose industrial grade quality is under TE control. The TE Connectivity choice is also consistent with the efforts for reducing the C02 content of our products and build a sustainable future. These products with recompound resin have been tested according to the relevant specifications and meet the product specific requirements.
| Product Change Notice Download |
07/20/2023 | P-23-024531 - Change to DU & MOQ. change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of July 20, 2023 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. No PPAP will be submitted for this PCN.
| Product Change Notice Download |
04/20/2023 | P-23-024435 - Tool replacement. TE Brazil is building a new mold (TPA Component) to current tooling replacement.
| Product Change Notice Download |
02/28/2023 | P-22-023343 - Mold Transfer. In order to improve the injection quality of our parts, we have decided to transfer several components (TPAs and CPAs) from Babyplast injection machines to conventional injection machines. Conventional injection mold machines are more stable and therefore our components are expected to have a more reliable injection process that will positively affect the quality of our connectors.
| Product Change Notice Download |
07/01/2021 | P-21-020950 - Manufacturing location change. Following Part Numbers will be transferred from TE China Suzhou LPZ 1162 to TE China Suzhou K2 3027. | Product Change Notice Download |
12/21/2020 | P-20-020072 - Alternate Manufacturing Location. Actually the PN 282080-1 is assembled in an automatic machine on TE Connectivity, but with the volume s increase, an alternative available is assembly this product in a manual method on our supplier. This is necessary to eliminate our past due and TE will be responsible to send all parts with the same quality. | Product Change Notice Download |
09/30/2020 | P-20-019284 - Manufacturing location change. Following Part Numbers will be transferred from TE San Salvo (Italy) to TE Suzhou (Asia-Pacific): 282078-2; 1-282078-2, in this transfer is involved the silicon mold: 21-0067822. The finished good involved is:282080-1/-2/-3. In San Salvo will remain the primary mold that cover all demand for market EMEA. The transfer of the mold 21-0067822 will serves only for market Asia Pacific. | Product Change Notice Download |
07/10/2018 | P-17-015095 - tool replacement of a molding for the TE part number 282073-1. | Product Change Notice Download |
08/16/2017 | P-16-013850 - New Tooling. | Product Change Notice Download |
02/15/2017 | P-16-013935 - Manufacturing location change. Following Part Numbers will be transferred from < TE Connectivity Suzhou EPZ> to < TE Connectivity Suzhou NEPZ>. | Product Change Notice Download |
01/31/2017 | P-16-013933 - Product improvement. The actual mold is not able to meet the production, and as a result of our continuous strive for capacity improvement increase of our production, we hereby inform you up front about a new tool (nbr 21-337770), which was built in the TE-BRAZIL to meet all specification requirements for an increasing market demand. The new tool will be established at the current manufacturing location (TE-BRAZIL). | Product Change Notice Download |
12/15/2016 | P-16-013591 - Product improvement. Add a new production line in TE NEPZ. | Product Change Notice Download |
11/28/2016 | P-16-013767 - Product improvement. As a result of our continuous strive for improving our delivery and meet our US customers capacity needs, we hereby inform you that TE US will introduce a second source for TE part numbers in this listing. The address of the second source is TE Connectivity, Rua ampere 304 Braganca Paulista, Sao Paulo 12929-570 Brazil, DUNS 908754679. Product meets all dimensions defined on the respective TE customer drawings, performance criteria specified in TE Product and Application Specifications. There is no change to fit, form or function of the product. There is no change to customer fixturing or application tooling. PPAP package will be sent for your review and approval prior to delivery of any product. Contact your local TE sales representative for support. | Product Change Notice Download |
04/11/2016 | P-16-012575 - UPDATE TO PCN P-16-012523. To ensure a smooth and stable transition from SWDC to EPDC, TE will be delaying the transition from the current Santa Teresa, NM DC (SWDC) to the new El Paso, TX DC (EPDC), originally scheduled to implement February 8th - 15th, is now scheduled to implement April 11th - 15th. This delay will allow extended testing on all SAP systems and procedures to ensure a seamless transition into the new warehouse. As we migrate the product and go-live on the new SAP WM software, it is critical to ensure this testing and training is fully incorporated into the systems and operational processes in the new El Paso warehouse. Based on the revised timing of transition, both Customer Shipments and Supplier Deliveries will continue to process from the Santa Teresa, NM location: Address: 101 Lindbergh, Santa Teresa, NM 88008, DUNS Code: 036967748. See attached Customer Letter. | Product Change Notice Download |
02/15/2016 | P-16-012523 - Location Change. TE has established a new Distribution Center in El Paso, TX to support our South-West Customers. The transition to El Paso will take place during the weekend of February 13th - 14th. | Product Change Notice Download |
04/30/2015 | E-14-009314 - Product Improvement. PA66 20% GF material has to be replace the actual one (PA66 13% GF). | Product Change Notice Download |
04/28/2014 | P-14-009873 - Document clarification. | Product Change Notice Download |