929937-1

JPT REC 2.8 Contact SWS Sn

Enhance your automotive, truck, bus, or off-road vehicle's connectivity with our JPT REC 2.8 Contact SWS Sn. Designed for durability and performance, this terminal features a secure F-Crimp termination method with tin plating, ensuring reliable power delivery in harsh environments. With a 30 A amperage rating and compatibility with wire sizes ranging from 1 to 2.5 mm², it's perfect for a wide range of applications. Operating flawlessly in temperatures from -40 to 130°C (-40 to 266°F) and boasting RoHS compliance, this receptacle terminal guarantees both safety and environmental responsibility. Its primary locking feature, the Locking Lance, provides an added level of security, making it a must-have component for your electrical systems. Upgrade your connectivity with confidence.
Availability
Immediate Shipment: NA
Stock Location: In Stock
Factory Stock: Call for Stock
Factory Lead:
Unit Of Measure:
Minimum/Multiple: NA/NA
Pricing
CALL: 800.400.7041
Product Category:
Manufacturer: TE Connectivity
Manufacturer Part Number: 929937-1
Amperage: 30 A
Termination Method: Crimp
Contact Plating: Tin
Operating Temperature Range: -40 - 130 °C, -40 - 266 °F
Wire Size: 1 - 2.5 mm²
Crimp Type: F-Crimp
Terminal Primary Locking Feature: Locking Lance
Terminal / Splice Type: Receptacle
Product: Automotive, Truck, Bus, & Off-Road Terminals
SKU: AMP929937-1
series: Junior Power Timer
Interface Plating: Tin (Sn)
Mating Tab Thickness: .8 mm / .031 in
Mating Tab Width: 2.8 mm / .11 in
Wire Insulation Diameter: 3.4 mm / 1.9 - 3 mm / 2.7 - 3 mm / .075 - .118 in
Wire Size Search: 14 AWG / 15 AWG / 16 AWG / 17 AWG / 1 mm² / 1.25 mm² / 1.3 mm² / 1.5 mm² / 2 mm² / 2.5 mm²
Terminal Transmits: 25 - 40 A (Power)
Wire Type: Copper
Sealable: Yes
Receptacle Style: 180°
Part Alias: 60.350.00

Environmental Initiative Details

Environmental Initiative: RoHS
Compliant: Unknown
Date of this Information: Unknown
Notes:

Product Change Notice

Effective Date Description of Change Download
02/20/2024 P-23-025380 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. Change was already communicated via P-23-024531 but new PCN informs about postponed activation date: As of February 20, 2024 we will increase the delivery unit & the min. order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders.
Download
02/20/2024 P-23-025381 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. Change was already communicated via P-23-024531 but new PCN informs about postponed activation date: As of February 20, 2024 we will increase the delivery unit & the min. order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders.
Download
02/07/2024 P-23-025483 - Supplier manufacturing location change. Sealing Plugs and Tool Inserts were transferred from plant location.

Download
07/20/2023 P-23-024531 - Change to DU & MOQ. change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of July 20, 2023 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. No PPAP will be submitted for this PCN.
Download
02/20/2018 P-17-015059 - Consolidation of distribution centers. Download
12/04/2017 P-17-014943 - Manufacturing location change. Following Part Numbers will be transferred from TE Kurim Czech republic to TE Korea. Download
12/04/2017 P-17-015017 - Tool Transfer. Download