Effective Date | Description of Change | Download |
03/23/2022 | P-22-022323 - Manufacturing location change. Part Numbers will be transferred from TE Connectivity Belgium bv to TE Connectivity Morocco SARL | Download |
02/20/2022 | PCN-22-129399 - Implementation postponement of the material change. we hereby inform you of the implementation postponement of the material change announced through PCN E-20-014128 for the part number(s) listed below. REASON OF CHANGE: This implementation delay is necessary to guarantee the smooth change over to the new material. IMPORTANT: The current and previous revisions of this part can be used interchangeably in the field. The change(s) are being phased in gradually and previous revision can remain stocked until use. Shipments of both configurations may be mixed.
| Download |
08/20/2021 | PCN-21-106141 - Revision letter alignment. The Industrial and Commercial Transportation business unit of TE Connectivity is making a change to the part number revision letter only to align with our internal production drawing. | Download |
04/23/2021 | P-21-020678 - Manufacturing location change. Following Part Numbers will be transferred from TE Connectivity Belgium bv to Outside Vendor. | Download |
04/09/2021 | E-20-014128 - Material change. Major Change: Product Material Change to PA6 DIN CAP 90 DEG & 180 DEG. | Download |
03/12/2021 | P-21-020395 - Manufacturing location change. Following Part Numbers will be transferred from TE Connectivity Morocco to Outside supplier in MoroccO.
| Download |
10/05/2020 | P-20-019456 - Manufacturing location change. Part Numbers will be transferred from Supplier Germany to TE Connectivity Tangier Morocco | Download |
04/19/2019 | P-18-016266 - We hereby inform you about a tool replacement of a molding for below listed TE products. As a result of our continuous strive for quality improvements of our production, we hereby inform you upfront about a new tool 21-1780761 for 965577-1 and 21-1780762 for 965783-1, both tools are under construction In order to meet all specification requirements to replace the current one, which is worn out. | Download |