Effective Date | Description of Change | Download |
12/30/2024 | P-24-027077 - Packaging Change. This is a notice of packaging change which contains stamped product reels for shipping. This change is specific to the reel flange which holds the stamped product associated with this notification. | Product Change Notice Download |
01/13/2023 | P-22-023612 - Min order quantity alignment. TE is changing its system as it relates to minimum order quantities for the part numbers listed to address trends that have been recently observed. We have identified situations where quantities can be ordered at quantities below what our standard packaging requirements allow. The situation also results in non-standard handling (break-pack) and creates risks for damage during transit to our customers. Therefore, we are making changes to align minimum order quantities with appropriate standard packaging requirements for these part numbers. | Product Change Notice Download |
12/09/2022 | P-21-021873 - Die transfer from EMEA (Wort, Germany plant) to Americas region (Greensboro, NC plant) to better serve Americas customers. Capacity addition project. The transferred tool will run in a new 40T 1100mm press. Tool location change only. No change to design form/fit/function. PN 7-1452671-1 and 7-1452671-3 requires changeover/conversion kit. Due to future capacity constraint in EMEA, Americas demand volumes will be localized to GSO plant. Added capacity in GSO. No bank build required. EMEA will continue to produce parts until all PPAPs approved and SOP in GSO plant. | Product Change Notice Download |
03/25/2021 | P-21-020510-2 - New Specification. TE Suzhou Process Label scan system update. TE Suzhou label Layout optimize and QR Code & Barcode optimize Barcode change to LT(3S) CODE QR code change to Part Number+ Package QTY+ PO Number+ Ver +date code+ Serial Number(0001~9999) This label change Not accept re-submit PPAP/PSW request | Product Change Notice Download |