Experience reliable connectivity with this housing for female terminals from the Junior Timer series. Engineered for automotive applications, this black connector is designed to ensure optimal performance in signal transmission. Its PBT GF body material meets UL 94-HB standards for safety and durability, while the 5mm pitch and 180° cable exit angle offer seamless integration. With a 12V DC voltage rating, polarization feature, and sealable construction, it guarantees secure and efficient operation in a wide temperature range from -40 to 100 °C (-40 to 212 °F). Ideal for wire-to-board or wire-to-device setups, this connector with 2 positions is a dependable choice for automotive connectivity solutions. Compliant with RoHS standards, it aligns with environmental responsibility while delivering high-quality performance.
AVAILABILITY
Immediate Shipment:NA
Stock Location:In Stock
Factory Stock:Call for Stock
Factory Lead:
Unit Of Measure:
Minimum/Multiple:1/1
Pricing
CALL:800.400.7041
Product Category:
Manufacturer:TE Connectivity
Manufacturer Part Number:TE Connectivity 963040-3
Series:Junior Timer
Gender:Housing for female terminals
Number of Rows:1
Pitch:.197 in, 5 mm
Voltage:12 V DC
Polarization:Yes
Body Material:PBT GF
Number of Positions:2
GPL:N06
Packaging:Package
Operating Temperature Range:-40 - 100 °C, -40 - 212 °F
Circuit Application:Signal
Sealable:Yes
GPL Description:Automotive
Product Code:M158
Connector System:Wire to Board, Wire-to-Device
Length:.921 in
Cable Exit Angle:180°
Height:1.398 in, 35.5 mm
Width:23.6 mm, .929 in
Mating Tab Width:.063 in, 1.6 mm
Nominal Voltage Architecture:12 V
Body Color:Black
Serviceable:No
Mounting Feature:Without
Terminal Position Assurance:No
Connector Position Assurance Capable:No
Hybrid Connector :No
Primary Locking Feature:On the Terminal
Material Flammability Standard:UL 94-HB
Part Aliases:963040-3
SKU:AMP963040-3

Environmental Initiative Details

Environmental Initiative:RoHS
Compliant:Unknown
Date of this Information:Unknown
Notes:

Product Change Notice

Effective DateDescription of ChangeDownload
02/20/2024P-23-025379 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of February 20, 2024 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders in case adjustments have not taken place in time.
Download
04/11/2016P-16-012582 - UPDATE TO PCN P-16-012531. To ensure a smooth and stable transition from SWDC to EPDC, TE will be delaying the transition from the current Santa Teresa, NM DC (SWDC) to the new El Paso, TX DC (EPDC), originally scheduled to implement February 8th - 15th, is now scheduled to implement April 11th - 15th. This delay will allow extended testing on all SAP systems and procedures to ensure a seamless transition into the new warehouse. As we migrate the product and go-live on the new SAP WM software, it is critical to ensure this testing and training is fully incorporated into the systems and operational processes in the new El Paso warehouse. Based on the revised timing of transition, both Customer Shipments and Supplier Deliveries will continue to process from the Santa Teresa, NM location: Address: 101 Lindbergh, Santa Teresa, NM 88008, DUNS Code: 036967748. See attached Customer Letter.Download
02/15/2016P-16-012531 - Location Change. TE has established a new Distribution Center in El Paso, TX to support our South-West Customers. The transition to El Paso will take place during the weekend of February 13th - 14th.Download
04/28/2014P-14-009870 - Document clarification.Download
04/28/2014P-14-009874 - Document clarification.Download