Effective Date | Description of Change | Download |
07/20/2023 | P-23-024531 - Change to DU & MOQ. change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of July 20, 2023 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. No PPAP will be submitted for this PCN.
| Product Change Notice Download |
03/25/2021 | P-21-020510-2 - New Specification. TE Suzhou Process Label scan system update. TE Suzhou label Layout optimize and QR Code & Barcode optimize Barcode change to LT(3S) CODE QR code change to Part Number+ Package QTY+ PO Number+ Ver +date code+ Serial Number(0001~9999) This label change Not accept re-submit PPAP/PSW request | Product Change Notice Download |
07/31/2020 | P-20-018484 - Die Transfer. The same die was transferred from TE Europe, we will localize & manufacture the same terminals in China Suzhou plant; no change for product 3F and die/tools, China will only supply the AP customers. AP CUSTOMERS ONLY FROM CHINA PLANT. | Product Change Notice Download |
12/13/2019 | P-19-018001 - Manufacturing location change. Following Part Numbers will be transferred from TE Steinach to TE Suzhou. | Product Change Notice Download |
11/22/2019 | P-19-017994 - Manufacturing location change. Following Part Numbers will be transferred from TE Steinach to TE W rt. | Product Change Notice Download |
02/20/2018 | P-17-015059 - Consolidation of distribution centers. | Product Change Notice Download |