Effective Date | Description of Change | Download |
05/17/2024 | P-23-025305 - Product improvement. As a result of a thorough analysis of demand picture matching our customer needs we are going to optimize production capacit
| Product Change Notice Download |
10/18/2023 | P-23-025128 - Resin supplier base extension. inform you about a resin supplier base extension for the 3pos Plug housing of the mentioned part numbers, which are under the design responsibility of TE Connectivity. This PCN is informational only and no further actions are necessary from your side, as this extension does not have any impact to form, fit or function change. The material itself will remain PA66-GF as stated on the general TE customer drawing. The PN in scope of this PCN is a general sales / catalogue part. Therefore, no contractual agreement related to sub-supplier selection is applicable. VDA 2 Trigger matrix use case 30 and PPAP towards customer/s are not applicable too. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. Internal release process is ensured by TE, including product validation.
| Product Change Notice Download |
04/14/2023 | P-23-024358 - Adding alternate manufacturing source. Adding TE Kunshan for alternate manufacturing source. PN is currently in series production at that location.
| Product Change Notice Download |
09/21/2022 | P-22-021988 - product Improvement. TE is building a new mold (housing component) to increase our production capacity of the SUPERSEAL 1.5 SERIES 3P product. The tool 21-0345145 will be released at TE Brazil. | Product Change Notice Download |
07/01/2021 | P-21-020950 - Manufacturing location change. Following Part Numbers will be transferred from TE China Suzhou LPZ 1162 to TE China Suzhou K2 3027. | Product Change Notice Download |
05/31/2021 | PCN-21-103344 - Running raw material change. Due to Force Majeure of resin suppliers, TE Connectivity has to switch at selected components to similar material with the similar characterizes as the existing material. PN 282087-1 is also affected for this reason. Hence the resin PA66-GF15 will be used instead of PA66-GF13.A new part number variant 282087-3 will be added for using resin PA66-GF15; this is only for TE India production location. Due to time constraints, TE Connectivity does not perform full testing. | Product Change Notice Download |
01/12/2019 | P-18-015873 - Duplication of a molding tool for the TE part number 282058-1. | Product Change Notice Download |
02/20/2018 | P-17-015059 - Consolidation of distribution centers. | Product Change Notice Download |
10/23/2017 | P-17-014782 - Manufacturing Location Change. TE Brazil added as second import source. This notification is only valid for customers in North America. | Product Change Notice Download |
09/01/2017 | P-17-014734 - Manufacturing Location Change. | Product Change Notice Download |
04/10/2017 | P-16-013491 - For following component part number we have built a new tool:282074-1, 282075-1, 282076-1, 282077-1. | Product Change Notice Download |
04/11/2016 | P-16-012575 - UPDATE TO PCN P-16-012523. To ensure a smooth and stable transition from SWDC to EPDC, TE will be delaying the transition from the current Santa Teresa, NM DC (SWDC) to the new El Paso, TX DC (EPDC), originally scheduled to implement February 8th - 15th, is now scheduled to implement April 11th - 15th. This delay will allow extended testing on all SAP systems and procedures to ensure a seamless transition into the new warehouse. As we migrate the product and go-live on the new SAP WM software, it is critical to ensure this testing and training is fully incorporated into the systems and operational processes in the new El Paso warehouse. Based on the revised timing of transition, both Customer Shipments and Supplier Deliveries will continue to process from the Santa Teresa, NM location: Address: 101 Lindbergh, Santa Teresa, NM 88008, DUNS Code: 036967748. See attached Customer Letter. | Product Change Notice Download |
02/15/2016 | P-16-012523 - Location Change. TE has established a new Distribution Center in El Paso, TX to support our South-West Customers. The transition to El Paso will take place during the weekend of February 13th - 14th. | Product Change Notice Download |
04/30/2015 | E-14-009314 - Product Improvement. PA66 20% GF material has to be replace the actual one (PA66 13% GF). | Product Change Notice Download |