Effective Date |
Description of Change
| Download |
07/11/2022 |
PCN-21-124955 - Manufacturing location change. AMPSEAL Header Housing and Plug Housing Manufacturing Location Change. The Industrial and Commercial Transportation business unit of TE Connectivity is transferring the following part numbers from Empalme, Mexico (TE-1104) to Tullahoma, Tennessee (TE-1060). These PNs are TE proprietary designs,therefore considered catalog/general market product. TE reserves the right to move tool back to prior location/ supplier based on business need. PPAP and/or sample requests must be submitted within 14 days of PCN submission via ict-ppap-request@te.com or ePPAP system. Submission will not occur without request. If PPAP requested, disposition response is required within 14 days of submit date or it will be considered approved. |
Download |
10/01/2021 |
PCN-21-112667 - Internal Plant Move. The Industrial and Commercial Transportation business unit of TE Connectivity is Moving the following part number(s) within the same facility at Empalme Mx. These PNs are TE proprietary designs, therefore considered catalog/general market product. TE reserves the right to move tool back to prior location/supplier based on business need. PPAP request must be submitted within 14 days of PCN submission via ict-ppap-request@te.com or ePPAP system, only PSW will be provided. Submission will not occur without request. If PPAP requested, disposition response is required within 14 days of submit date or it will be considered approved. |
Download |
08/15/2021 |
E-20-017968 - Product improvement. TE Connectivity is making a change to the mounting hole geometry on all 14-position vertical and right-angle AMPSEAL headers for the part number(s) listed below. These PNs are TE proprietary designs, therefore considered catalog/general market product. PPAP and/or sample requests must be submitted within 14 days of PCN submission via ict-ppap-request@te.com or ePPAP system. Submission will not occur without request. If PPAP requested, disposition response is required within 14 days of submit date or it will be considered approved. Product drawing(s) are affected. |
Download |
09/02/2019 |
E-19-010127 - AMPSEAL Products shipping location change from Tullahoma TN USA to Distribution Center at Greensboro NC USA. |
Download |
01/31/2019 |
E-18-019025 - Location Change. This PCN is an addendum to previous AMPSEAL PCN numbers E-18-008460. In an effort to maximize our capacity, our intent is to move the molding of the header housing and the dispensing of the flange seal material on the header assemblies from the current TE molding and assembly manufacturing location to a new single TE manufacturing location in Empalme, Sonora, Mexico. This second TE facility is located in the same compound as the current TE facility.
|
Download |
11/05/2018 |
E-18-016185 - Addendum to PCN E-18-008460. The PPAP submission email address was not included in PCN E-18-008460. To aid in customer PPAP receipt, this information is being supplied. |
Download |
10/15/2018 |
E-18-013692 - Purpose is advanced notification of manufacturing changes related to AMPSEAL Vertical Headers. AMPSEAL is a TE Connectivity General Market product line, the design and tooling is TEs, with sales to many customers. TE Connectivity will be releasing a new semi-automated header pin assembly cell A new vertical header pin manual stitching and automated testing line work center will be implemented. New assembly cell will be located at a qualified TE Connectivity US ICT manufacturing location, an IATF certified site. The new line will produce all sizes of the vertical header. There are no changes to component material or TE suppliers. |
Download |
08/01/2018 |
E-18-008460 - Scope of changes in this notification include: New capacity molds, Additional automated assembly lines, Assembly line transfers Manufacturing location change: from Empalme, Sonora, Mexico to Tullahoma TN Plant. (Tullahoma plant is IATF certified) Packaging change: To meet AIAG standards, Automated packaging in plastic trays, Better protection during shipping, Quantity per box change. |
Download |
07/09/2018 |
E-18-010675 - Manufacturing location change. Terminal manual stitching and testing line work center move from one TE manufacturing location to a second TE manufacturing location within the same complex in Empalme Mx. To continue to support the increase in production demand and to allow for a continuous flow of material through the manufacturing process. A Level 4 PPAP will be available upon request. |
Download |
04/27/2018 |
P-17-015262 - Product improvement. TE Empalme Consolidation Project Molding Process. |
Download |