Effective Date | Description of Change | Download |
04/02/2023 | PCN-23-165170 - Manufacturing location change. TE Connectivity is transferring the following part number(s) from TE ICT Tangier Morocco 1218 to TE Kissling Germany 1257 . These PNs are TE proprietary designs, therefore considered catalog/general market product. TE reserves the right to move tool back to prior location/supplier based on business need. PPAP and/or sample requests must be submitted within 14 days of PCN submission via ict-ppap-request@te.com or ePPAP system. Submission will not occur without request. If PPAP requested, disposition response is required within 14 days of submit date or it will be considered approved. | Product Change Notice Download |
04/01/2023 | PCN-23-170265 - Location Change Cancellation. please be informed that the tool move of following part number(s) from TE ICT Tangier Morocco 1218 to TE Kissling Germany 1257 announced in PCN-23-165170 dated 01-FEB-23 has been cancelled.
| Product Change Notice Download |
03/28/2023 | PCN-22-161937 - Material Change. Please be aware of an upcoming material change to the listed part numbers. Old Material : POCAN A 3131 replaced by New Material :KF PBT-G30, NC116
| Product Change Notice Download |
09/27/2021 | PCN-21-114361 - Manufacturing locations added. The listed part numbers will now also be manufactured at TE Connectivity china plant via local chinese outside vendors. An internal release based on our specifications will be executed before any parts will be delivered.
| Product Change Notice Download |
07/20/2021 | PCN-21-107572 - Alternate Material. TE Connectivity is approving an alternate material for the 6-21 POS Secondary Locking Devices with the part number(s) listed below. The Alternate Material is also a PBT/ASA GF30, similar to the current Material in production. These PNs are TE proprietary designs, therefore considered catalog/general market product. PPAP and/or sample requests must be submitted within 14 days of PCN submission via ict-ppap-request@te.com or ePPAP system. Submission will not occur without request. If PPAP is requested, disposition response is required within 14 days of submission date or it will be considered approved. Product drawings are not affected by this change. | Product Change Notice Download |
10/25/2019 | P-19-017991 - Manufacturing location change. Following Part Numbers will be transferred from TE Steinach to TE Tangier ICT.
| Product Change Notice Download |
06/28/2019 | P-18-016295 - Duplication of Production Tool. We hereby inform you about a tool duplication of a molding tool for the TE part number 967633-1,967634-1,967635-1. As a result of our continuous strive for capacity increase of our production, we hereby inform you upfront about a new tool 21-1780949, which is under construction In order to meet all specification requirements to cover increasing market demand and which will run in addition to the current one. | Product Change Notice Download |