Effective Date | Description of Change | Download |
11/30/2024 | PCN-24-219068 - Manufacturing location change. we hereby inform you of this manufacturing location change because our Rhode Island, USA supplier is closing and transferring the stamping/forming process to another TE approved supplier in USA. The manufacturing location change will not impact product or connector performance.
| Product Change Notice Download |
10/15/2024 | PCN-24-210586 - Material Change. approved a new copper alloy base material for the part number(s) listed below. These PNs are TE proprietary designs, therefore considered catalog/general market product. PPAP and/or sample requests must be submitted within 14 days of PCN submission via ict-ppap-request@te.com or ePPAP system. Submission will not occur without request. If PPAP requested, disposition response is required within 14 days of submit date or it will be considered approved. Product drawings are affected. | Product Change Notice Download |
08/15/2023 | PCN-23-170097 - Tool Duplication. TE Connectivity is adding new capacity tooling for DEUTSCH size 20 stamped & formed pin and socket terminals at our existing factory in Suzhou, Jiangsu (China) for the part number(s) listed below. These PNs are TE proprietary designs, therefore considered catalog/general market product. PPAP and/or sample requests must be submitted within 14 days of PCN submission via ict-ppap-request@te.com or ePPAP system. | Product Change Notice Download |
07/31/2023 | PCN-23-172659 - Location Change. manufacturing location change because our California, USA stamping supplier is closing and transferring the stamping/forming process to their sister company in Rhode Island, USA. The manufacturing location change does not impact connector performance and will be phased in gradually over the next 3-12 months. | Product Change Notice Download |
06/15/2022 | PCN-22-141161 - Purchase or Supplier Change. adding a new base material supplier for the part number(s) listed below. These PNs are TE proprietary designs, therefore considered catalog/general market product. PPAP and/or sample requests must be submitted within 14 days of PCN submission via ict-ppap-request@te.com or ePPAP system. Submission will not occur without request. If PPAP requested, disposition response is required within 14 days of submit date or it will be considered approved. Product drawings are not affected. | Product Change Notice Download |
08/28/2017 | E-17-008492 - Supplier Change. | Product Change Notice Download |