51164-1205

2.50mm Wire-to-Board Mini-Lock Terminal Position Assurance (TPA) Retainer, Glow-Wire Capable, 12 Circuits

Enhance the security of your connections with our Mini-Lock TPA Term Pos Assurance series. Designed for reliability, these gray connectors feature 12 contacts in a single row, ensuring seamless connectivity. Crafted from durable polyester, they meet stringent material flammability standards for peace of mind. Each component includes Terminal Position Assurance for added stability. With CSA and UL agency certifications, as well as RoHS compliance, you can trust in the quality of these RJ connector accessories. Perfect for Ethernet and fiber optic setups, they come packaged in a convenient bag for easy handling. Elevate your connectivity solutions with our Mini-Lock TPA Term Pos Assurance series.
Availability
Immediate Shipment: NA
Stock Location: In Stock
Factory Stock: Call for Stock
Factory Lead:
Unit Of Measure:
Minimum/Multiple: NA/NA
Pricing
CALL: 800.400.7041
Product Category:
Manufacturer: Molex
Manufacturer Part Number: 51164-1205
Color: Gray
Series: 51164 - Mini-Lock - TPA - Term Pos Assurance
Connector Type: Mini-Lock, TPA - Term Pos Assurance
Number of Contacts: 12
Number of Rows: 1
Material: Polyester
Component Type: Terminal Position Assurance
Packaging: Bag
Number of Contacts Loaded: 12
CSA Agency Certification: LR19980
UL Agency Certification: E29179
Material Flammability Standard: 94V-0
Part Aliases: 0511641205
SKU: MOL51164-1205

Environmental Initiative Details

Environmental Initiative: RoHS
Compliant: Unknown
Date of this Information: Unknown
Notes:

Product Change Notice

Effective Date Description of Change Download
01/04/2023 512420 - Equipment Transfer, Production Transfer or Rearrangement.
Production plant location change
- Current : Molex Japan
- After : Molex Vietnam
* Change reason :
To better serve our customers and to leverage our global manufacturing footprint, Molex will relocate
production of the 2.5MM W/B from Japan vendor to Molex Vietnam production facility. This change will
started in Q3 2022 and target to complete in Q4 2022. Buffer stock and capacity tooling will be built as
need to ensure a seamless transfer.
Download